- Report correctly to the developers the problem with the printing error file on IMS (Files get print two times), etc.
- Open the software issue again about the data files that doesn't download
- Request on software issues change from double click to click
- Finish SHMSL UG
- Gantry UG:
- Start to unify the format.
- Add the Exlar Utility (Started)
- Add caliper Calibration Utility.
- Add how to assemble and disassemble the caliper
- Training on APCT3 (Ongoing)
- Training on CTD (Ongoin)
- Training Kuster tools (Will it be used during this expedition?)
- Training Sediment Temperature Tool (Will it be used during this expedition?)
- Kerry: Downhole logging (Saw tools, remain look at the data)
- Training VSP (Ensemble guns, remain: Deploy them, measure and see the data)
- Petrel training needed.
- Add TCON vacuum pump logsheet to Confluence.
- NGR training
- NGR min section
- XRAY, review how to reprocess the imagers and add the explanation to the manual (if it is not there)
- Continue NI inventory
- MS and MSP Measure standards, and compare with previous measurements (X396T)
- NGR background, 6 h or 12 h? (X396T)
- Radiation and Laser trainings
- Geodesc
- Training in 3D printer: Mini JR
- Escribir Brad sobre goals
- Envio X396T listo antes de 5 de agosto con la hoja de informacion
- Dar 2 QEPro a Eric para enviar
- Hacer tests con la QEPro nueva para asegurar que mide bien
- Encontrar en WRMSL donde cambiar para medir water pusher a 23 cm.
- Escanear expediciones y cuadernos que me faltan.
- Hacer conversion de datos de SHMSL del AL-standar