Expedition 397P was a roughly one month tie-up in Cape Town with a service call for SERCO (Emile Mylan for microscope maintenance) and a full suite of computer replacements in all labs. A Kick-the-tires-light-the-fires effort was executed after/during install. The documentation here includes details on Imaging related issues encountered during this period.

Imaging and other services provided

  • Produce selected ID batches for IODP staff
  • KTLF
  • Production of group photos (IODP tech and general group)
  • T-shirt logo contest organization
  • T-shirt printing
  • GEODESC testing/working closely with devs and 397 expedition planning

System Status

PICAT

Tested post computer replacement, result: fully functional. New Adobe Suite installed on PC, use NetIDlogin credentials.

TIFF images don't get uplaoded uploaded by Image Capture. Image Capture does sometimes skip TIF or JPG file upload if the user doesn't pick the metadata as flow from top to bottom.

...

Microscope property numberMicroscope TypeDiagnosis
90871 Axioscope A1 POLStage counterweights had to be cut down which was accomplished for all three specimen holder sets of that type on board
90869 Axioscope A1 POLXY stage faulty (inner pulley system problem), Serco can’t fix this, needs to go back to Zeiss – tested 3 other stages, 2 out of 3 are broken and will be send to College Station to be forwarded to Zeiss
91187 Axio Imager A2

- known issue with PCBA board, which has missing parts on order,

- scope is set up for fluorescence, unsure why in that spot

91188 Axio Imager A2 (MBIO)

No issue reported.

90229 Axioplan POL

Bertrand lens is de-laminated, attachment not useful, so it was removed.

90207 Axioscope POL (Thin Section)

No issues reported.

90257 Axiophot

Stage couldn’t be moved far enough to focus on specimen, it was discovered that gear inside wasn’t lined up, Serco had to remove focus knob covers and align 15 O-rings back to where they are needed in order to move stage to correct positions.

Recommendation from Serco – don’t tinker with inner workings of scopes if not absolutely necessary, send to Zeiss or have Zeiss rep service call.

91060 Stereoscope

Magnification knob doesn’t stop at 1x or 8x, no way to fix it as body is glued shut. Stored in Imaging Lab as fall back for high usage expeditions.

90812 Stereoscope

No issue reported.

91105 Stereoscope

No issue reported.

90811 Stereoscope

No issue reported.

90812 Stereoscope

No issue reported.

90228 Stereoscope SV11 (reserve in Imaging Lab)

No issue reported.

ODP00584 Old grey stereoscope (reserve in Imaging Lab)

No issue reported.


Microscope cameras (SPOT)

The SPOT ideal (USB communication) cameras installed on all stereomicroscopes work well on the new generation PCs that were installed this tie-up, however the other (black) SPOT cameras are not communicating properly over the fire wire connection. For now, the old PCs are back on these stations until we can purchase different cameras , or IT can find a solution to communicate with the camerafirewire cameras. IT ordered different PC boards to test with the these cameras. They might be delivered for 397T (unsure) or 397.

...

The IMS code has been updated just like on all other IMS loggers. Several old bugs were back and had to be fixed again. A bug list KTLF testing/development cycles took care of the major problems. The instrument is back to full functionality. A list of requests to increase user friendliness can be found in the confluence bug tracking sheetssytem.


PHOTOGRAPHY

No issues encountered. All equipment is working well.

...

  • Printer ink for Epson ecotank and Stylus
  • Phone case/screen protector for Foldio iPhone
  • Light bulbs for Imaging Office
  • Tripod head that holds more weight (for remote setup for group pictures)
  • Light bulbs for Imaging Lab overhead light fixture

Items ordered

  • Small tripod for Foldio phone

...

One additional task was to prepare for the new SEM/EDS system install during 397T. A tracking confluence page has been created, where all information, manuals, progress etc. are reported. It would be nice to keep using this tracking page until the project is finished and approved by all stake holders. The page is located on the front page of the Laboratory Notebook and linked: 379PT SEM EDS install. All tasks associated with 397P have been accomplished.

Took over responsibility of PUBS KTLF testing.