...
ACTION | SYMBOL | RESULT |
Call the Bridge (200) and ECR (290) and tell them you are deploying the maggie | Get the OK to before proceeding | |
Connect cable to towfish | Towfish is connected in a secure place on the fantail | |
Turn on power to isolation transceiver*Insert Picture of on/off switch next to blue box above the Bathy* | Blue light flickers and goes off then solid green light | |
Launch SeaLINK software on the opposite computer that the Winfrog software is running | Ignore Repeat Functionality Disabled error for now. Okay through any Sync messages. | |
Power up (Ctrl-O) (May turn off if already on) |
| Command window will read: Power ON |
| Command window will read: ‘Towfish not synced’ in first line followed by ‘Setting Towfish time’ and finally ‘Towfish time was set’ | |
| This will display your output parameters in the command window and should read close to these values. (Between 013-015mA, and 00.6-00.8W is acceptable). Output 47.6V, 014mA, 00.6W ‘ S:006 B:+47.9V T:+022.3C D:+000.4m
| |
|
| Data logging status will now be OFF |
Stop magnetometer cycling by clicking ‘Stop cycling of Mag’ icon | Command window will read: Cycling off | |
Check NMEA GPS data is coming in from Winfrog | NMEA Window is on bottom left just below command window | Window will be scrolling as new GPS info is being received from Winfrog software. If not receiving GPS continuously refer to Winfrog guide on connecting I/O devices through COM ports or ask LO/Underway Tech to help connect)
|
Get the towfish in the water, just below the water line | Towfish is just far enough out to be stable in the water. | |
| or ‘p’ in command window | Command window will ask ‘zero pressure Y/N’. Press Y and command window will read: ‘Zero pressure is * mV’ |
|
| Towfish is now at its full towed length. Refer to Maggie User Guide if unsure where to stop the spool. |
| or F7 | Command window will read: ‘Time set - *current date and time* followed by ‘Setting towfish Time…’ |
Enter layback length (0m) True layback offset is set in WinFrog, the GPS data coming into SeaLINK will already have this offset applied. | Command window will read: ‘Layback length changes from *.* to 0.0 (m)’ | |
Sync GPS with towfish | or F8 | Be patient until you receive ‘Synchronization failed’ error. Click ‘Okay’ (Unsure if this step is neces |
Click ‘Appending GPS position to Fish output’ icon |
| GPS Tagging status should now be ON |
Turn on Auto tuning | or ‘x’ in command window | Command window will read: ‘Auto tuning on’ |
Create a new logging file with ‘Start logging on a new SeaLINK file’ icon. | New file will be created automatically in C:\Exp Mag Data\EXP#
| |
Cycle at 0.3Hz by selecting 0.3Hz icon | Command window will read: ‘Cycling at 0.3Hz’ | |
Start logging data with ‘Toggle SeaLINK File Logging’ icon | Data Logging status will now be ON
| |
Check signal status indicators | Status readouts located above command window | Should have NO RED indicators, YELLOW is acceptable, GREY is good |
Call the Bridge (200) and tell them maggie is deployed |
|
|
Go to LO office and connect monitor to the Winfrog computer running SeaLINK software |
| Maggie can now be monitored from LO office.
Done! |
...