Make a plan as to what hardware will be run with the tool(whether it is out of a APC/XCB, RCB, or logging bit). Make sure the core techs have all hardware needed to assemble the tool into its protective pieces and attach it to the drill string. The drill pipe will be positioned with the bit ~10 meters above the target sample depth. The tool is normally run down at ~70m/min(this can be decided with the Ops Manager). Once After the tool is landed in the BHA wait until 15 minutes before the sample chamber will close. At this time the mud pumps should be turned off and the drill string(tool) and pipe will be lowered together the final 10 meters with the mud pumps switched off 15 minutes prior to when the target sample chamber should closedepth. This will allow the sample to be collected at the final lowered depth as the entire water column is displaced. Wait until 5-10 minutes after tool should be closed to ensure sample is secured before bringing it up.

...