...
- Click Start Measuring on main TK04 window (Figure 3) to start the measurement procedure.
Measuring Samples
...
1.
...
Confirm configuration settings shown in the lower part of the TK04 screen, insert the probe into the hole drilled into the sample, and click Start Measuring.
...
2.
a. Drift control (DCL)
...
will repeat until the criterion for drift (set in the Expert Options window) is met.
Each drift control measurement takes 0.5 min.
...
For DCL = 40, drift control is <10 series (~5 min). For DCL = 10, drift control is <30 series (~15 min).
...
3.
...
b. Sample heating and measuring begins
...
. Temperature values are corrected automatically for the drift effect predicted from the last drift series.
...
4.
2. Best solutions calculated by the TeKa SAM algorithm are shown on the screen.
...
Uploading and Verifying Data in LIMS
...
1.
...
3. Close Measuring Configuration window at the end of the measurements.
NOTE: Remember to clean the needle and/or puck before the measuring of a new sample.
Uploading Data to LIMS
- On ThermCon window (Figure 2), click Upload to LIMS
...
- .
...
- If upload is successful,
...
- the message
...
- "Logged results for sample …" is shown
...
- .
- Close the ThermCon program
...
Verifying Data in LIVE (LIMS Viewer)
Run LIVE from the ship application page to check thermal conductivity data:
- Select the PHYS_PROPS_Summary template.
- Select the Site/Hole/Interval to be queried.
- Click View Data.
Retrieving Data from LIMS Reports
...
1.
...
Go to LIMS Reports at http://webserv.ship.iodp.tamu.edu:8080/UWQ/.
...
2.
...
Under Select Report, choose Physical Properties > Thermal Conductivity (TCON).
a. Note: The "expanded" report shows all of the database parameters and may be confusing to a general user; use the "standard" report.
...
3.
...
Under Select Sample Range, specify Expedition, Site, Hole, and Section image(s) to retrieve.
...
4.
...
Click View data or Download data file to view results or download a CSV file.
After Verifying Data Upload
...
1.
...
Once uploaded data are confirmed, clean the needle probe and place it in its storage container.
...
2.
...
- if finish or click Clear Form if another sample will be measured.
Credits
V368X (T. Cobb, B. Novak) ;V371T – 7/11/17 (T. Cobb); V1.1; M. Hastedt 8/15/2011 reviewed |S. Frazier March 2018.
All improvements to the Quick Start Guides and User Guides are a communal effort, with honorable mention to the group of LOs, ALOs, and technicians who have helped.
...