Before an electrode can be used, it must be calibrated against pH buffers in the range expected in samples. Generally, calibration at pH 4, 7 and 10 covers the necessary range. Make sure the gray side-hole plug for the electrode is unplugged before starting a measurement.

Image Added



  1. Make sure the water bath temperature is set to 25°C. Ensure no air bubbles are present in the acid dispensing line. Press DOS on the body of the titrator to push acid through the line to remove potential air bubbles. Select Calibrate Electrodes from the Main instrument panel.
  2. Enter your range of buffers (4, 7, 10).
  3. Select your Drift Span. The default drift span is 30.
  4. Place 3 mL of the first buffer solution in the vessel. Add stir bar. Remove the electrode from the storage solution, rinse with DI water, and blot dry with a Kimwipe. Do not rub the electrode, as this can cause a static charge. Insert the electrode tip into the titration vessel (not touching the bottom of the cup or the stir bar). Confirm that the frit is in the solution.
  5. Select Cal 1 and then Start. Measure until the drift gets close to 0.0. Usually approximately 500 seconds will be adequate. Select Stop when satisfied with measurement.
  6. When finished, clean vessel and the electrode.
  7. Repeat steps 4–6 with each calibration buffer, selecting Cal2 and Cal3 when appropriate.
  8. When all three buffers have been run, the slope value of the regression curve should be close to –59 pH/mV. Select OK-Save to save the calibration.

...