Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

This page is for communication between PP Techs on different shifts. It describes issues pending to resolve during the current expedition.

X395C

ZM:

June 13, 2021

  • Tcon vacuum pump logsheet done. I did it like the MAD oven one. Please check it and do suggestions.
  • MAD containers: 
    • I kept the containers that were in the shelf (old ones) inside the PP-5B drawer.
    • The containers that you checked are now on the shelf.
  • SHIL: The load position was changed in order to allow more space to work with the 360 set up. It was changed in: Motion - Setup - Fixed Position - Load position  from -11.5 cm (section halves) to -13.50 cm (360)
  • The sea water bucket with sea water is under the splitting table. Behind the paper towels. 

June 15, 2021

  • XRay images will be taken with both processing parameters APC and XCB.
  • MAD: Remember to tare the balances if they have not been used for more than 6 hours.
  • MAD: Remember to clean the mouth of the vials

June 16, 2021

  • XRAY: How to reprocess the images? How to save the files?

June 18, 2021

  • TCON and Pwave one each core, because now the advance is 5 m. Measure TCON in the same core as the MBIO sample, if possible.
  • TCON: Increase the time of the pump to 8 hours? We have enough time between cores.
  • Core flow: 360-SHIL - TRACKS - SPLIT - TCON - GANTRY works really well.

AR

June 16, 2021

...

X392

DPL PENDING TASKS FOR THE EXPEDITION

  •  Make a 8 cm template in QC Viewer to check standards on blue endcap
  •  Add improvements on processing images on XRAY
  •  Jurie: Ask for changes in Gantry
  •  Maggie: Luz de SHMSL
  •  NGR: Info curso revisar para que quede lista
  •  Estudiar NGR
  •  Estudiar tibetano
  •  Ver clases que me faltan de tibetano
  •  Train Traq


GENERAL

  • Review position and think on ideas to install the new XSAN.
    • Length 234.6 cm, width 111.6 cm and high 176.5 cm  
  • Adjust SHMSL light


DPL PENDING TASKS FOR THE EXPEDITION


  •  Report correctly to the developers the problem with the printing error file on IMS (Files get print two times), etc. Open the software issue again about the data files that doesn't download
  •  Request on software issues change from double click to click
  •  Finish SHMSL UG
  •  Gantry UG:
    •  Start to unify the format.
    •  Add the Exlar Utility (Started)
    •  Add caliper Calibration Utility.
    •  Add how to assemble and disassemble the caliper
  •  Training on APCT3 (Ongoing)
  •  Training on CTD (Ongoin)
  •  Training Kuster tools (Will it be used during this expedition?)
  •  Training Sediment Temperature Tool (Will it be used during this expedition?)
  •  Kerry: Downhole logging (Saw tools, remain look at he the data)
  •  Training VSP (Ensemble guns, remain: Deploy them, measure and  see the data)
  •  Petrel training needed.
  •  Add TCON vacuum pump logsheet to Confluence.
  •   Review NGR training info
  •  NGR min section
  •  XRAY, review how to reprocess the imagers and add the explanation to the manual (if it is not there)
  •  XRAY, change the manual to add the new process imaging tool
  •  Continue NI inventory
  •  MS and MSP Measure standards, and compare with previous measurements (X396T)
  •  NGR background, 6 h or 12 h? (X396T) 
  •  Radiation and Laser trainings
  •  Geodesc
  •  Training in 3D printer: Mini JR
  •  Escribir Brad sobre goals
  •  Envio X396T listo antes de 5 de agosto con la hoja de informacion
  •  Dar 2 QEPro a Eric para enviar
  •  Hacer tests con la QEPro nueva para asegurar que mide bien
  •  Encontrar en WRMSL donde cambiar para medir water pusher a 23 cm. (?????)
  •  Escanear expediciones y cuadernos que me faltan.
  •  Hacer conversion de datos de SHMSL del AL-standar
  •  Add to WRMSL QUG and UG how to measure hard rock