This page is for communication between PP Techs on different shifts. It describes issues pending to resolve during the current expedition.

X395C

ZM:

June 13, 2021

  • Tcon vacuum pump logsheet done. I did it like the MAD oven one. Please check it and do suggestions.
  • MAD containers: 
    • I kept the containers that were in the shelf (old ones) inside the PP-5B drawer.
    • The containers that you checked are now on the shelf.
  • SHIL: The load position was changed in order to allow more space to work with the 360 set up. It was changed in: Motion - Setup - Fixed Position - Load position  from -11.5 cm (section halves) to -13.50 cm (360)
  • The sea water bucket with sea water is under the splitting table. Behind the paper towels. 

June 15, 2021

  • XRay images will be taken with both processing parameters APC and XCB.
  • MAD: Remember to tare the balances if they have not been used for more than 6 hours.
  • MAD: Remember to clean the mouth of the vials

June 16, 2021

  • XRAY: How to reprocess the images? How to save the files?

June 18, 2021

  • TCON and Pwave one each core, because now the advance is 5 m. Measure TCON in the same core as the MBIO sample, if possible.
  • TCON: Increase the time of the pump to 8 hours? We have enough time between cores.
  • Core flow: 360-SHIL - TRACKS - SPLIT - TCON - GANTRY works really well.

AR

June 16, 2021

...

X392

DPL PENDING TASKS FOR THE EXPEDITION

  •  Make a 8 cm template in QC Viewer to check standards on blue endcap
  •  Add improvements on processing images on XRAY
  •  Jurie: Ask for changes in Gantry
  •  Maggie: Luz de SHMSL
  •  NGR: Info curso revisar para que quede lista
  •  Estudiar NGR
  •  Estudiar tibetano
  •  Ver clases que me faltan de tibetano
  •  Train Traq


GENERAL

  • Review position and think on ideas to install the new XSAN.
    • Length 234.6 cm, width 111.6 cm and high 176.5 cm  
  • Adjust SHMSL light


DPL PENDING TASKS FOR THE EXPEDITION


  •  Report correctly to the developers the problem with the printing error file on IMS (Files get print two times), etc.
  •  Open the software issue again about the data files that doesn't download
  •  Request on software issues change from double click to click
  •  Finish SHMSL UG Gantry UG:
    •  Start to unify the format.
    •  Add the Exlar Utility (Started)
    •  Add caliper Calibration Utility.
    •  Add how to assemble and disassemble the caliper
  •  Training on APCT3 (Ongoing)
  •  Training on CTD (Ongoin)
  •  Training Kuster tools (Will it be used during this expedition?)
  •  Training Sediment Temperature Tool (Will it be used during this expedition?)
  •  Kerry: Downhole logging (Saw tools, remain look at the data)
  •  Training VSP (Ensemble guns, remain: Deploy them, measure and  see the data)
  •  Petrel training needed.
  •  Add TCON vacuum pump logsheet to Confluence.
  •   Review NGR training info
  •  NGR min section
  •  XRAY, review how to reprocess the imagers and add the explanation to the manual (if it is not there)
  •  XRAY, change the manual to add the new process imaging tool
  •  Continue NI inventory
  •  MS and MSP Measure standards, and compare with previous measurements (X396T)
  •  NGR background, 6 h or 12 h? (X396T) 
  •  Radiation and Laser trainings
  •  Geodesc
  •  Training in 3D printer: Mini JR
  •  Escribir Brad sobre goals
  •  Envio X396T listo antes de 5 de agosto con la hoja de informacion
  •  Dar 2 QEPro a Eric para enviar
  •  Hacer tests con la QEPro nueva para asegurar que mide bien
  •  Encontrar en WRMSL donde cambiar para medir water pusher a 23 cm. (?????)
  •  Escanear expediciones y cuadernos que me faltan.
  •  Hacer conversion de datos de SHMSL del AL-standar
  •  Add to WRMSL QUG and UG how to measure hard rock