Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Tools #1858035C & #1858032C will be sent back for Calibration.

They lost their saved cal files when batteries were replaced at a previous time, and so we requested updated calibration files from shore to use in the meantime when downloading logged data.

4 x Tools is in the current return shipment returning to the ship after calibrations.

Made a new VIT bracket attachment for the Niskin bottle, and ran it along with the CTD with every VIT run.

...

Thermal conductivity had intermitted readings. At first it was thought that the pucks were faulty, but after the instrument was opened we found the ribbon cable not seated properly. Reseated cable and unit worked well.

X-Ray Track

Replaced source with the new spare.

Splitting Room

Replaced 2 front shaft bearings on the Parallel Rock saw that was making alot of noise. Ordered 4 new ones for spares.

...

Replaced broken Switch PCB on new A2 Scope with new spare. The new PCB however did not come with the switch extender that feeds through the back panel, nor the ribbon cable.

The old board was not left in place and just disconnected, and we cannot find it anywhere to use the botton extender and cable on the new board.

Focsle Deck

Chem Lab

Serviced small oil less vacuum pump. Unit is in ET shop and a new vacuum guage has been ordered for intallation.

...

2 of the specialized fluorescent lamps blew and the electricians replaced them with normal ones for time bieng. New correct bulbes were ordered.

Upper Tween Deck

Assisted with assembly of the Temp incubator hood.

...