Anchor | ||||
---|---|---|---|---|
|
Author(s): | Lisa Crowder |
Reviewer(s): | Bill Mills, Heather Barnes |
Editor(s): | Herrmann |
Supervisor Approval (Name, Title, Date): | |
Audience: | Laboratory Specialists |
Origination date: | |
Current version: | 374 March 2018 |
Domain: | Core Lab |
System: | Core Splitter |
...
- Remove the Servo motor and then unbolt, and lift one end (use a chain fall) to expose the under carriage. Remember to block the lift so that it cannot fall while you perform maintenance.
- Wash down and remove any sediment. Don't wash dirt under the steel band that protects the internal mechanism.
- Remove the end covers on the linear actuators and check if the motor belts need tightening.
- Examine the cable management system for abraded cables or other indications of wear.
- Remove the top covers of the linear actuators and check the ball screws to see if they need cleaning or additional lubrication.
Parts Information
Frame, Carriage, Tray and Housing
Vendor: A&A MachiningModel: Custom
Digital Servo Controller
Vendor: Parker Automation Model: Gemini GV6-U6ESpare: Available
Servo Motor
Vendor: Parker Automation
Model: MPP0923D1ENPSV
Spare: Available
Planetary Linear Gear Reducer
Vendor: BaysideModel: Spare:
Belt Driven Linear Actuators
Vendor: Parker AutomationModel: HPLA800 Dual Stage with 2300mm travel, Corrosion resistant, S03 Flange Configuration, 803-2534BSpare: Available 803-2534C
Operator Interface
Vendor: Parker CompumotorModel: RP240 Operator Interface for Servo Controller PLCSpare: Available
Joystick
Vendor: SureGripModel: JBDM-BL-06 with JM-P1-06-PS5 AssemblySpare: Available
Saw Motor
Vendor: Baldor RelianceIndustrial MotorsModel: MVM3559DSpare: Available
Electronic Motor Brake
Vendor: AmbitechModel: Short Stop SSU2G5SSpare: No
Motor Protector
Vendor: KlocknerMoellerModel: PKZMO-10 (PN XTPR010BC1)Spare: Available
...
The Core Splitter is a very robust piece of equipment and only needs a full service every five years or so. The Core Splitter should only be dismantled under the direct supervision of the Lab Officer or their appointed designee. Have the ship's electricians isolate the power to the Core Splitter before beginning the work.
The following images document, in part, the full dismantling of the Core Splitter in 2015. Additional images are in the Uber Saw folder in IODP_Share.
Removal of the blade flange from the saw motor.
Saw motor before and after refurbishment.
Left: Lifting of the saw housing off of the splitter with a chain hoist.
Right: Lifting of the port end of the splitter with a chain hoist.
Left: Lifting of the port end of the splitter and blocking.
Right: Lifting of the starboard end of the splitter.
Left: Blocking of the starboard end of the splitter.
Right: Removal of the side brackets of the splitting carriage.
Left: Underside of the splitter showing linear actuators and travelling blocks for the splitting carriage.
Right: Top of the linear actuators with the brackets that attach them to the splitter frame.
Left: Linear actuators with brackets removed.
Right: Motor shaft separated for cleaning and inspection.
Left: Removal of the protective cover of the actuator belt drive.
Right: Linear actuator belt.
Left: Linear actuator travelling block.
Right: Belt attachment to travelling block.
Left: Travelling block limit switch, one of two.
Right:
Archive Version
- Core Splitter User Guide 397T 2022-09-28
- Core Splitter UG 378S 2020-02-23