Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 33 Next »

This page is for communication between PP Techs on different shifts. It describes issues pending to resolve during the current expedition.

X395C

ZM:

June 13, 2021

  • Tcon vacuum pump logsheet done. I did it like the MAD oven one. Please check it and do suggestions.
  • MAD containers: 
    • I kept the containers that were in the shelf (old ones) inside the PP-5B drawer.
    • The containers that you checked are now on the shelf.
  • SHIL: The load position was changed in order to allow more space to work with the 360 set up. It was changed in: Motion - Setup - Fixed Position - Load position  from -11.5 cm (section halves) to -13.50 cm (360)
  • The sea water bucket with sea water is under the splitting table. Behind the paper towels. 


June 15, 2021

  • XRay images will be taken with both processing parameters APC and XCB.
  • MAD: Remember to tare the balances if they have not been used for more than 6 hours.
  • MAD: Remember to clean the mouth of the vials

June 16, 2021

  • XRAY: How to reprocess the images? How to save the files?

June 18, 2021

  • TCON and Pwave one each core, because now the advance is 5 m. Measure TCON in the same core as the MBIO sample, if possible.
  • TCON: Increase the time of the pump to 8 hours? We have enough time between cores.
  • Core flow: 360-SHIL - TRACKS - SPLIT - TCON - GANTRY works really well.


AR

June 16, 2021

  • Remember to complete excel spreadsheet for standards





GENERAL

  • Review position and think on ideas to install the new XSAN.
    • Length 234.6 cm, width 111.6 cm and high 176.5 cm  









DPL PENDING TASKS FOR THE EXPEDITION

  • Report correctly to the developers the problem with the printing error file on IMS (Files get print two times), etc.
  • Open the software issue again about the data files that doesn't download
  • Request on software issues change from double click to click
  • Finish SHMSL UG
  • Gantry UG:
    • Start to unify the format.
    • Add the Exlar Utility (Started)
    • Add caliper Calibration Utility.
    • Add how to assemble and disassemble the caliper
  • Training on APCT3 (Ongoing)
  • Training on CTD (Ongoin)
  • Training Kuster tools (Will it be used during this expedition?)
  • Training Sediment Temperature Tool (Will it be used during this expedition?)
  • Kerry: Downhole logging (Saw tools, remain look at he data)
  • Training VSP (Ensemble guns, remain: Deploy them, measure and  see the data)
  • Add TCON vacuum pump logsheet to Confluence.
  • NGR training
  • NGR min section
  • XRAY, review how to reprocess the imagers and add the explanation to the manual (if it is not there)
  • Continue NI inventory
  • MS and MSP Measure standards, and compare with previous measurements (X396T)
  • NGR background, 6 h or 12 h? (X396T) 
  • No labels