Log of Repairs (Where, When, What)
Core Lab
November 2023
- Painted Core Entry, Correlator, WRMSL floor.
October 2021
- Repaired the floor under the PMAG Haskris. Used RedHand as filler, sanded and painted.
March/April 2020
- Removed old SRM floor pads
- Removed old description table's floor brackets
- Welded new brackets for new layout
- Repaired cracks in floor
- Filled holes with cement and covered with EAA200/201
- Painted
Splitting Room
Jan/Feb/March 2021
- Repaired dents/chips on splitting table with small kits
- Gel Coated splitting table (supersaw trough and working counter)
May 2020
- new floor laid by outside company in Amsterdam. Extra material left over is in BFLM
March 2020
- Removed Floor, primed and prepped for new floor (May 2020, Amsterdam)
Down Hole Measurement Lab
March 2021
- Removed old bartop epoxy resin from main table
- Leveled main table (sanded)
- Reapplied new bartop epoxy resin