CORE DECK REPAIRS
Log of Repairs (Where, When, What)
Core Lab
November 2023
Painted Core Entry, Correlator, WRMSL floor.
October 2021
Repaired the floor under the PMAG Haskris. Used RedHand as filler, sanded and painted.
March/April 2020
Removed old SRM floor pads
Removed old description table's floor brackets
Welded new brackets for new layout
Repaired cracks in floor
Filled holes with cement and covered with EAA200/201
Painted
Splitting Room
Jan/Feb/March 2021
Repaired dents/chips on splitting table with small kits
Gel Coated splitting table (supersaw trough and working counter)
May 2020
new floor laid by outside company in Amsterdam. Extra material left over is in BFLM
March 2020
Removed Floor, primed and prepped for new floor (May 2020, Amsterdam)
Down Hole Measurement Lab
March 2021
Removed old bartop epoxy resin from main table
Leveled main table (sanded)
Reapplied new bartop epoxy resin