This page is for communication between PP Techs on different shifts. It describes issues pending to resolve during the current expedition.
X395C
ZM:
June 13, 2021
- Tcon vacuum pump logsheet done. I did it like the MAD oven one. Please check it and do suggestions.
- MAD containers:
- I kept the containers that were in the shelf (old ones) inside the PP-5B drawer.
- The containers that you checked are now on the shelf.
- SHIL: The load position was changed in order to allow more space to work with the 360 set up. It was changed in: Motion - Setup - Fixed Position - Load position from -11.5 cm (section halves) to -13.50 cm (360)
- The sea water bucket with sea water is under the splitting table. Behind the paper towels.
June 15, 2021
- XRay images will be taken with both processing parameters APC and XCB.
- MAD: Remember to tare the balances if they have not been used for more than 6 hours.
- MAD: Remember to clean the mouth of the vials
June 16, 2021
- XRAY: How to reprocess the images? How to save the files?
June 18, 2021
- TCON and Pwave one each core, because now the advance is 5 m. Measure TCON in the same core as the MBIO sample, if possible.
- TCON: Increase the time of the pump to 8 hours? We have enough time between cores.
- Core flow: 360-SHIL - TRACKS - SPLIT - TCON - GANTRY works really well.
AR
June 16, 2021
- Remember to complete excel spreadsheet for standards
GENERAL
- Review position and think on ideas to install the new XSAN.
- Length 234.6 cm, width 111.6 cm and high 176.5 cm
DPL PENDING TASKS FOR THE EXPEDITION
- Report correctly to the developers the problem with the printing error file on IMS (Files get print two times), etc.
- Open the software issue again about the data files that doesn't download
- Request on software issues change from double click to click
- Finish SHMSL UG
- Gantry UG:
- Start to unify the format.
- Add the Exlar Utility (Started)
- Add caliper Calibration Utility.
- Add how to assemble and disassemble the caliper
- Training on APCT3 (Ongoing)
- Training on CTD (Ongoin)
- Training Kuster tools (Will it be used during this expedition?)
- Training Sediment Temperature Tool (Will it be used during this expedition?)
- Kerry: Downhole logging (Saw tools, remain look at the data)
- Training VSP (Ensemble guns, remain: Deploy them, measure and see the data)
- Petrel training needed.
- Add TCON vacuum pump logsheet to Confluence.
- NGR training
- NGR min section
- XRAY, review how to reprocess the imagers and add the explanation to the manual (if it is not there)
- Continue NI inventory
- MS and MSP Measure standards, and compare with previous measurements (X396T)
- NGR background, 6 h or 12 h? (X396T)
- Radiation and Laser trainings
- Geodesc
- Training in 3D printer: Mini JR
- Escribir Brad sobre goals
- Envio X396T listo antes de 5 de agosto con la hoja de informacion
- Dar 2 QEPro a Eric para enviar
- Hacer tests con la QEPro nueva para asegurar que mide bien
- Encontrar en WRMSL donde cambiar para medir water pusher a 23 cm.