Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

9 June 2022 - 9 August 2022; Cape Town to Cape Town

Jurie Kotze & Etienne Claassen


Summary

  • Both APCT-3 Tools onboard had no calibration files saved. Both to be sent back for Calibration.
  • Replaced bearings on Parallel Rock Saw.
  • Replaced heater elements in Chem Lab Oven.
  • Replaced Motor Brushes on small treadmill.
  • CNC Probe Repaired.


DHML

Ran APCT-3 #1858035C Tool on:

U1558F - 3,7,10

U1583C - 4,7,10

U1583E - 5,8

U1560C - 5,8,11

Tools #1858035 & #1858032 will be sent back for Calibration.

4 x Tools in current return shipment after calibrations.

Made a new VIT bracket attachment for the Niskin bottle, and ran it along with the CTD with every VIT run.


Core Lab

ThermCon

Thermal conductivity had intermitted readings. At first it was thought that the pucks were faulty, but after the instrument was opened we found the ribbon cable not seated properly. Reseated cable and unit worked well.

Splitting Room

Replaced 2 front shaft bearings on the Parallel Rock saw that was making alot of noise. Ordered 4 new ones for spares.

Repaired a stepped off wire at the base of one of the yellow transducer pads, and made the connection more robust.























  • No labels