CORE DECK REPAIRS

Log of Repairs (Where, When, What)

Core Lab

November 2023

  • Painted Core Entry, Correlator, WRMSL floor.

October 2021

  • Repaired the floor under the PMAG Haskris. Used RedHand as filler, sanded and painted.

March/April 2020

  • Removed old SRM floor pads

  • Removed old description table's floor brackets

  • Welded new brackets for new layout

  • Repaired cracks in floor

  • Filled holes with cement and covered with EAA200/201

  • Painted

Splitting Room

Jan/Feb/March 2021

  • Repaired dents/chips on splitting table with small kits

  • Gel Coated splitting table (supersaw trough and working counter)

May 2020

  • new floor laid by outside company in Amsterdam. Extra material left over is in BFLM

March 2020

  • Removed Floor, primed and prepped for new floor (May 2020, Amsterdam)

Down Hole Measurement Lab

March 2021

  • Removed old bartop epoxy resin from main table

  • Leveled main table (sanded)

  • Reapplied new bartop epoxy resin

 

 

How To (Videos, Instructions, Images)

Removing Polytex 13 epoxy resin (Bartop) DHML center table

Laying Polytex 13 epoxy resin (Bartop) on DHML center table

Laying Polytex 13 epoxy resin (Bartop) on DHML portside counter